Introducing DRM4® Food Supplement For Skin
Beautiful, glowing skin with a smooth complexion achieved by Oxford Biolabs® scientists. DRM4® is specifically designed to supply your skin with vital nutrients which help to tackle signs of skin ageing induced by UV radiation, air pollution, and oxidative damage.DRM4® Food Supplement For Skin has been specifically designed for people experiencing premature signs of ageing skin caused by factors like oxidative damage, UV radiation, toxins, pollution, and poor diet. As a potential solution for helping to improve lines, wrinkles and blemishes, DRM4® packs a proven formula of omega-3/omega-6 rich oils, plant extracts, vitamins and minerals vital for a healthy skin condition.
YOUTHFUL SKIN by using DRM4®
DRM4® Skin Rejuvenation Complex
Omega-3/Omega-6 fatty acids
The natural plant and algae oils of DRM4® provide substantial amounts of omega-3 fatty acids. Fatty acids play a critical role in normal skin function and appearance. Fatty acids may prevent UV-induced sun damage, extrinsic signs of skin ageing.
Lycopene
A well-known dietary carotenoid that is believed to play an important role in the protection of the skin against photooxidative damage. DRM4® also contains many other antioxidants that aid in reducing free radical skin damage.
HOW IT WORKS
Premature skin ageing is mainly driven by the exposure of the skin to UV radiation (sun exposure, sunbed usage) and air pollutants from traffic-related exhaust fumes and industrial air pollution (carbon monoxide, sulphur oxides, nitrogen oxides, ground-level ozone, polycyclic aromatic hydrocarbons, volatile organic compounds, particulate matter), which is especially problematic in urban areas.
DRM4®’s proprietary skin rejuvenation complex follows the latest scientific findings on skin preservation and rejuvenation. It features a unique combination of essential omega-3 and omega-6 fatty acids, strong antioxidants, skin-supporting vitamins, and minerals, which all help to combat the negative influences of UV radiation and air pollution. This is achieved by helping the skin to increase its barrier function as well as to control UV- and air pollutants-induced free radicals, thereby keeping the damage to the skin minimised. Long-term usage of DRM4® Molecular Food Supplement for Skin helps to prevent premature skin ageing and keeps skin fresh and youthful looking.