Our new bundles are here — perfect for gifting! Shop now →

collection.title

Combat the silver blaze of ageing with the natural scientific formula of Melaniq®. The Melaniq® formula was scientifically formulated to support normal pigment production in hair follicles by supplying vital nutrients for melanin biosynthesis and the promotion of healthy hair.

Melaniq® Molecular Food Supplement for Hair Pigmentation has been developed for men and women experiencing premature greying, greying in general and those looking to prevent greying before it starts. The unique Melaniq® formula supports normal pigment production in hair follicles by supplying vital nutrients that can reduce the impact of factors associated with greying. Crucially, Melaniq® includes copper, a necessary component of the biosynthesis of melanin, the natural pigment that gives hair its colour.

Watch interview with
Dr. Manfred Gahrtz

Molecular Biologist and Chief Scientist at Oxford Biolabs talks about Melaniq®

How it works

Melaniq® is made from the highest quality ingredients and manufactured in Germany to guarantee each capsule packs the optimal concentration of nutrients. When hair follicles don’t get enough vitamins and minerals, or when free radicals cause enough damage, the ability to produce melanin gradually comes to an end.

How it works

74% of MEN AND WOMEN TURN GREY BETWEEN AGE 45 AND 65
EXPERIENCE THE MAINTENANCE OF
TRUE COLOURS after using Melaniq®
For those experiencing premature greying, greying in general and those looking to prevent greying before it starts
Important nutrients necessary for melanin biosynthesis that can help to slow down the process of greying
Maintenance of normal hair pigmentation
melaniq results
For further details click here
Treatment Prevention Men Women

Oxford-Rooted Science
Backed by World-Class R&D
100% naturally-based, risk & side-effect free
Developed in Oxford, UK
Manufactured in Germany

Suitable for vegetarians not tested on animals

Melaniq® Hair Pigmentation Complex

NATURAL POLYPHENOLS

At the heart of Melaniq®’s proprietary hair pigmentation complex is a unique combination of natural polyphenols which are extracted from Green Tea and Japanese Pagoda Tree Bark via a special process. As powerful antioxidants they have been shown to specifically protect melanocytes from oxidative damage caused by free radicals.

ASCOPHYLLUM NODOSUM

This unique wild-harvested brown algae contains iodine which, via the thyroid hormones, fires up hair cell metabolism and hair pigment production.

Shop now

How it works

The enzyme at the heart of melanin production is tyrosinase. The activity of this important enzyme is dependent on the availability of copper which is built into the active centre of tyrosinase. It has been shown that people suffering from premature greying have a reduced level of copper in their blood serum. An insufficient supply of copper results in the reduced activity of tyrosinase and hence reduced pigment production, ultimately causing the onset of grey hair.

Melaniq®’s proprietary hair pigmentation complex supports melanin production in hair and helps maintain your natural hair colour.

Oxford Biolabs Shop

Discover the best products at Oxford Biolabs